Please spare a few minutes by clicking here to fill out a Project Questionnaire to help us understand your needs. Please share as detailed information as possible. We will get back to you within 24 hours. 
 

We will check with you all the details, such as size, material, function, etc. before working on a rendering. Normally we will provide rendering in 3-5 working days. Urgent cases are also supported. If needed we can sign an NDA with you.
Feel free to contact us for more details: contact us

Hopefully you could provide at least two production samples. It will help us calculate a more accurate cost and shorten the quotation time.
If production samples are not available, please provide us with similar items for analysis.
Please contact us for more related contents: contact us

For an existing product, we will evaluate and provide quotation within 3-5 working days based on the provided samples. A cost breakdown will be provided if needed.
For a new project we need to work on the rendering and structure, which takes 5-7 working days. A cost breakdown with tooling list (if needed) will be provided in another 3-5 working days.

Please let us know the quantity needed for the white samples / mock up samples / pre-production samples/ production samples during the project process. 
Normally we will provide 2 white samples, 1 mock up, 1 PP sample, and 1 production sample if needed..
If you want to know more about Longmarch, please click

Please refer to this estimated schedule for your reference. Timeline may extend if the product is complicated.

White sample

3-7 days

Specified PMS color samples

10-15 days

Aluminum tooling for mock up samples

10-15 days

Mock up samples

15-20 days

Pattern prints

10-15 days

We are also able to provide rush order support upon request. Please contact your Project Manager for further discussion on re-scheduling a timeline to meet your needs.

Yes for sure. We will advise on how to properly protect the product in a most cost-effective way. Be it shipped with loose cartons or with pallets, we will offer satisfaction based on ample experiences.
You can learn more here: components-packaging

We never compromise on quality. Protecting and enhancing your brand reputation is always one of our top priorities. The comprehensive quality control system enables us to ensure the highest quality from outset through delivery. Detailed inspection and testing are conducted during every stage of the production to ensure the product quality.
To better understand our quality control system, please refer to this link.

Please find the following timeline for reference. Lead time may vary per order. Please talk with your Project Manager for a more specific time upon order confirmation.

Standard order

Rush order

Remarks

30-35 days upon sample approval

20-25 days

No tooling needed

Kindly inform us in advance of the inspection time, standards, quantity and other necessary information if a third-party inspection is required. Do not hesitate to let us know if you have additional requirements. We will provide you with effective suggestions for different situations.

If you want to know more, please click on the relevant links on our official website: this link

  • For mock up sample orders, 100% payment in advance is required.
  • For tooling orders, 70% down payment is required, and balance is due upon pre-production sample approval.
  • For production orders, we require a 30% deposit and balance before delivery.

*The down payment can be discussed if the order reaches a certain amount.

That depends on the item. For example, if RoHS is required the MOQ would be 5,000pcs.
Please contact us for more details: contact us